Project Summary
Client: VRC / Multiplex
Date: 2018
Location: Flemington Race Course
Crane: Franna, 40T, 80T, 200T & 220T Cranes
Project Overview
CHALLENGE: The VRC multiplex included the installation of precast ‘petals’ to each level. This required the use of a specific construction sequence and the erection of a significant temporary structure to facilitate construction.
OUTCOMES: In addition to developing the precise construction sequence during planning stages, the construction of the VRC multiplex was achieved through the coordination of multiple machines including mobile cranes, scissor lifts, boilermakers, franna cranes, all while working alongside other crews on the project. This was made possible by working closely with the builder during planning stages and comprehensive understanding of the engineered temporary works package.