Project Summary
Project Overview
CHALLENGE: 25 Tonne bridge beam installation in accordance with the Lifting plan. EXTENSIVE LIFTS = COMPREHENSIVE LIFT STUDY = DETAILED RIGGING. Here’s a quick snapshot: 20T Soft Slings at 15 metres long, 35T Shackles sheathed through 10T Slings. Not even at the main hook yet. Our well organised system is proven to achieve maximum productivity with minimum wasted effort or expense.
OUTCOMES: The Premier team coordinated the logistics to enable the smooth transition from delivery to installation for our client.