Overhead powerlines are one of the most serious hazards in crane operations, and overlooking them can have fatal consequences.
At Premier Cranes & Rigging, we understand that safe lifting starts well before a crane arrives on site.
Whether working on a construction project in Melbourne or an infrastructure site across Victoria, identifying nearby electrical hazards is an essential part of lift planning.
Why Powerlines Are a Serious Risk
Operating mobile cranes near overhead powerlines requires careful planning, as contact with energised electrical infrastructure can cause electrocution, serious injuries and equipment damage.
Common risks include:
- Crane movement: Booms, hooks and suspended loads entering electrical No-Go Zones.
- Limited clearance: Restricted working areas near overhead electrical infrastructure.
- Unexpected hazards: Powerlines overlooked during initial site inspections.
- Poor communication: Unclear responsibilities between crane crews and site personnel.
Even without direct contact, electricity can arc across an air gap under certain conditions.
Look Up and Live: A Tool for Safer Lift Planning
The Look Up and Live mapping application helps identify overhead electrical infrastructure during the planning stage.
As highlighted in CICA Crane Safety Bulletin #322, Victoria’s overhead powerlines were added to the application, providing another resource for crane operators and lift planners.
The tool can help teams:
- Identify mapped overhead powerlines near a proposed lifting area.
- Consider electrical hazards before selecting crane positions.
- Plan appropriate clearances and risk controls.
- Identify when further consultation with electricity network operators may be required.
Importantly, the application supports lift planning but does not replace site inspections, verified network information or required electrical safety controls.
How Premier Plans Lifts Near Powerlines
At Premier, managing electrical hazards means identifying risks early and ensuring appropriate controls are in place before lifting begins.
Our approach focuses on:
1. Site Assessment
Identify overhead electrical infrastructure, access restrictions and potential crane operating areas.
2. Lift Planning
Consider crane configuration, boom movement, load travel paths and required clearances from electrical hazards.
3. Safety Controls
Establish applicable No-Go Zones and arrange necessary controls, including authorised spotters or network operator involvement where required.
4. Crew Communication
Ensure operators, dogmen and riggers understand the identified hazards, approved lift plan and their responsibilities.
Where safe clearances cannot be maintained, work must not proceed until suitable controls have been established.
Safe Lifting Starts Before Setup
Powerline safety is not something to address once the crane is operating.
At Premier Cranes & Rigging, we believe early hazard identification, proper lift planning and clear communication are essential to protecting everyone on site.
It’s part of our #TeamLifting approach, where everyone has a role in keeping lifting operations safe.
Because looking up before lifting can prevent a life-changing incident.